Total land
area = 750 m2
-Total Build-up area = 455 m2
-Peak Cooling Capacity = 10
RT
-Project duration = 6 months
-Date Commissioning = December
2001
-1 unit of 10 RT
Bush
Air Cooled Scroll Compressor
-Supply Chilled Water temperature = 11oC
-Return Chilled Water temperature = 5.5oC
Air
Distribution
-Central Air Handling Units